"Installer: checker in payload lib, config scaffold, CI template"
TASK-DOCS-019: Installer: checker in payload lib, config scaffold, CI template
Summary
Deliver plan item T12 (Phase 4) from docs/plans/PLAN-status-v3-platform-2026-07-27/plan.md: fleet-install-test green; fresh install carries hook+config+(optional) CI template.
Problem
Status v3 is still a session preview and enforcement is not yet the platform standard. Without this task, the mothership and consumer fleet keep the v2 page and cannot enforce THE RULE consistently.
Proposed Solution
Execute Phase 4 for T12 exactly as specified in the plan, preserving non-negotiables: THE RULE, no history rewrite, determinism, offline-first, consumer sovereignty. Every commit cites TASK-DOCS-019.
Alternatives Considered
- Keep a second extractor beside render-status-hub — rejected by plan (fold into one generator).
- Rewrite git history to fix links — rejected; ledger-only retro fixes.
- Auto-set
doneon green gates — rejected; HITL remains mandatory.
Success Metrics
- Primary: acceptance core is true — fleet-install-test green; fresh install carries hook+config+(optional) CI template.
- Guardrail: no hand-edited derived payload copies; pair/parity and payload hooks remain the mirror path.
Scope
In: plan §7 T12 and its Phase 4 steps. Out: docs/status-v2-preview; silently choosing traceability.scaffold_ci default (P0 open question); push/merge/tag without operator instruction.
Dependencies
Upstream: TASK-DOCS-009. Downstream: TASK-DOCS-022, TASK-DOCS-023, TASK-DOCS-028. Source plan: docs/plans/PLAN-status-v3-platform-2026-07-27/plan.md.
1. Description
- 1.1 This task MUST deliver its plan §7 item while preserving THE RULE, no history rewrite, determinism, offline-first, and consumer sovereignty.
- 1.2 Acceptance core MUST be met as stated in Summary.
- 1.3 Every commit for this task MUST cite its canonical TASK id.
- 1.4 Green machine gates are necessary and never sufficient; HITL gates remain mandatory.
- 1.5 Derived payload copies MUST NOT be hand-edited.
Acceptance Criteria
- [ ] AC 1 (traces_to: #1.1, #1.2) — plan item acceptance core is demonstrably met for this task's Phase gate - verify: plan Phase gate checklist + recorded evidence in the ship packet
- [ ] AC 2 (traces_to: #1.3) — every commit for this task cites its canonical TASK id in subject or body - test:
bash scripts/check_task_link.sh --range <base>..<head> - [ ] AC 3 (traces_to: #1.4) — review and final acceptance HITL gates are not self-crossed; agent halts with evidence - verify: STATUS-REFERENCE §1.4 / ship-tasks halt
- [ ] AC 4 (traces_to: #1.5) — no hand-edited derived payload copies land in the PR - test:
bash tools/install/check-pair-parity.shwhen generator/docs-tools touched
Test plan
bash scripts/tests/run_all.shwhen scripts/hooks touched- docs-site / DOM / fleet tests named by the phase plan when those surfaces are touched
bash .cyberos/cuo/gates/run-gates.shbefore the review packet
AI Authorship Disclosure
- Tools used: Cursor agent (GPT-5.6 Sol) drafting from the approved plan.
- Scope: re-derived and CONFIRMED: plan §7 item ids T1–T22 and Phase 0–8 sequencing are taken from
docs/plans/PLAN-status-v3-platform-2026-07-27/plan.mdas read in this worktree. re-derived and CORRECTED: none — no numeric or citation claim from an earlier draft was corrected in this rewrite. measured and ADDED: task ids TASK-DOCS-008..029 allocated viabacklog-mutate next-id docsat mint time; audit figures were treated as claims to verify, not facts to copy. - Human review: Operator approved the plan and reviews at CyberOS HITL gates.
End of TASK-DOCS-019.
Audit
Verdict summary
task@1 profile for plan T12. Acceptance core and dependency cone are explicit. Score 10/10 after the findings below.
Findings (all resolved)
ISS-001 — Template/body mismatch
engineering-spec headings with task@1 marker failed FM-004. Resolved: rewritten to task@1 sections.
ISS-002 — Missing RULE citation
Could ship unlinked commits. Resolved: Proposed Solution requires citing TASK-DOCS-019.
ISS-003 — Vague acceptance
"Do the phase" was untestable. Resolved: Summary/Success Metrics quote the plan acceptance core.
ISS-004 — Silent scaffold_ci default
Would pre-judge P0. Resolved: Scope marks it out-of-scope / open.
ISS-005 — Derived copy edits
Risk of pair drift. Resolved: Success Metrics guardrail forbids hand-editing derived copies.
ISS-006 — Dependency reciprocity
Orphan edges. Resolved: depends_on/blocks from plan graph (TASK-DOCS-009 / TASK-DOCS-022, TASK-DOCS-023, TASK-DOCS-028).
Resolution
All 6 concerns addressed. Score = 10/10.