Task — engineering-spec@1
"Dream budget, latency and drift gates"
duplicateTASK-IMP-025
TASK-IMP-025: Dream budget, latency and drift gates
1. Description
Groomed 2026-07-25 (batch/10): duplicate of TASK-MEMORY-247 (dream budget/latency/drift gates). Stub never authored.
Author the normative clauses when this task is picked up; it was migrated as a draft stub.
Migrated 2026-07-08 from the deep-audit improvement backlog, folded into the task system as class: improvement. Source report refs: Stage, 2.
Acceptance criteria
- [ ] (to be authored from the source report before this task leaves draft)