Task — engineering-spec@1
"Go-live readiness gate (safety nets before fully on)"
closedTASK-IMP-067
TASK-IMP-067: Go-live readiness gate (safety nets before fully on)
1. Description
Groomed 2026-07-25 (batch/10e): closed — won't-do for 1.x: go-live readiness gate depends on Tracks A/B/C.
Closed without further authoring — out of CyberOS 1.x payload scope (batch/10e won't-do). Reopen only if a later release revisits this work.
Migrated 2026-07-08 from the deep-audit improvement backlog, folded into the task system as class: improvement. Source report refs: go-live.
Acceptance criteria
- [x] N/A — closed won't-do for CyberOS 1.x (batch/10e); acceptance criteria not authored.