Task — engineering-spec@1
"Schedule MCP/OBS resume wave after IMP-139 triage"
doneTASK-IMP-142
TASK-IMP-142: MCP/OBS + APP-001 resume schedule
Context
IMP-139 Gate-2 applied dossier recommendations: 11 route_back (MCP-003/005/006/007/008, OBS-001/003/005/007/008/009) → ready_to_implement, and TASK-APP-001 resume → implementing. Leaving them idle recreates the stuck-WIP class G13 detects.
Deliverable (this task)
Author the schedule only (no implementation of the MCP/OBS work itself):
- Record the three sub-batches in
docs/batches/batch-9-post-120-followups.mdWave 3 section (already drafted). - Preconditions: IMP-141 + MEMORY-302
donebefore starting 9a. - Per-cluster intent: re-spec/adopt against measured tree paths (
services/mcp-gateway/,services/shared/), not abandoned claimed layouts.
Acceptance
- batch-9 ledger lists 9a-mcp / 9b-obs / 9c-app with member IDs.
- This task's status can advance once the schedule is linked from the parent batch ledger (no code changes required beyond docs).